With the carpet down, it meant that we could finally move a few things back into the front room (which we did later that afternoon).

We also brought down some boxes from the loft, which contained a load of flat packed bookcases that we had ordered back in January (cos it was my birthday and Ikea hadn’t opened yet). It took a while to actually build them all, but it was so much nicer than the random book cases and shelves we had there before.

At the same time, we also ordered in some blinds. We did the blinds ourselves in the two bedrooms we decorated, so this should be fine. Although bay windows are a bit awkrard as you have to the know the size of the blinds, to know how big the blinds need to be. Fortunately the company provides you with a guide on how to fake it with some cardboard. And it basically worked.

As well as my birthday, we also had Kate’s birthday whilst we were decorating, and we got a couple of terrariums to put around the house.

This enclosed one came from a shop in Exeter called Hutch, that we really like, and it’s doing really well.

It took a while but we got all of the shelves up and drilled them all together, and pleasingly found that we had some space left of some of the shelves (partly because the book case is bigger, and aortly becasue we have kept some of our junk of the old book cases that are now upstairs). A perfect excuse to buy more book (and more Lego).

Nice organised book cases means we finally got all of our books together, inludin the many garden/planting/growing/foraging books.

Oh, and we finally got rid of the horrible table that the previous occupant left behind. It was nice to see the back of it partly cos it was old and skanky, but also because we had no dining room whilst decorating, so we had to resort to eating breakfast, lunch and dinner in the kitchen with a couple of the old chairs. Not only was this difficult, but it took up what little room we have in the kitchen anyway, so when we finally got the new table in, and the old chairs got taken to the recycling centre, the kitchen felt massive! (It didn’t last long, it feels tiny again now).

The table was nice and simple and the wood and differnt coloured chairs all matched in with the decor of the new rooms. And despite trawling around all of the furniture shops over the May Day bank holiday weekend, we ended up going with John Lewis, as it was the only one we saw that wasn’t completely awful.

It still needs a few finishing touches, maybe a few more pictures and definitely a clock, but it’s 1000x better than it was before.

Much tidier (except for the charger cable)

When we get a few more things added in, we’ll post another update.

Living on a Prayer – part 2

[Check out part 1, if you haven’t read it already.]

The plumber came first on 19th February 2018 and installed three radiators (Hallway, living room and dining room). He also advised us that our boiler is at least 18 years old (because apparently from 2000 all boilers sold had to be condenser boilers – and ours is not that ) and that we are doing well for it to still be working.  (Admittedly it’s a bit temperamental – but his comment has allowed us to prioritise the new boiler to be one of the next jobs).

[Aside – As we want our new boiler to be located in the attic, rather than wasting our valuable kitchen space, this is due to be an expensive job.  I would rather, however, have this job prioritised and spend the money on doing it at our convenience then having it unexpectedly break and either have a new boiler quickly installed without having it moved, or having one installed and us going without hot water in the meantime.]

He was quick and got all the old radiators off and the new ones on (and copper piping done) in a day, which was handy.

We weren’t sure what order things were going to be done in, but we knew that as well as the radiator/plumbing, we had the plasterer coming and a carpenter to do the window sill, and someone to swap the door around, so we tried to get everything ready. And by chance on the same day as the plumber (and at almost the exact same time) a Virgin Media engineer turned up to move the cable entry point. It was a silly little job,  but it meant that we didn’t have leads trailing all over the place, and it made sense to get it done before the plasterer turned up.

One thing were very glad to see the back of was the old window sill. This had rotted and had some weird growth beneath it. We think that at some point there must have been a leak and the wood slowly rotted away. And the attmept to fix this was some to leave it an cover the mould with some decorators caulk.

The plasterer came over just a few days later, again fortunately when we were both off and were attending a cookery course over at River Cottage, so we were able to get everything ready but also didn’t have to sit in the house whilst the work was going on.

Note the Wifi Router protected but in place

Impatient

The plastering was actually one of our biggest problems. Whilst 95% of it was fine, we had a few problems with the rest of it. The problem areas were all of the difficult parts, like around the sockets, pipes, and floor. There were sections that had just been missed around the copper piping, that we had to fill in ourselves, and gaps around the skirting, which although would eventually be covered by the skirting boards, were so uneven that we’d spend many hours trying to make it fit for purpose.

Please mind the gap

All white

Then it snowed.

After that, we got back to painting and decorating.

Starting to come together

Kate’s idea of decorating

But my skills aren’t much better

Although our calculations on the paint were pretty damn accurate

Oh yeah, then it snowed again.

I must admit that writing this makes it seem like as soon as the plaster went on, we got everything painted. But in reality this took fucking ages. For weeks, it was was a case of waking up, going to work, coming home, painting, sleeping, and repeat. It was quite soul destroying.

But eventually, we got there. And in the process we did learn a few thing about decorating, that we put together in a quick guide.

Then we had the carpenter come to put the new window sill in. Some time last year we purchased a load of oak sills ready to go into the windows as and when they were ready. Again, we were keen to see this, having had such horrible sills there before. After about 15 minutes of the carpenter being there, he did notice that the wood we had wasn’t actually going to fit in the window properly. Basically, I had fucked up the measurements and not thought things through properly. But in contrast to the plasterer, the carpenter was fantastic, and was actually able to fix my mistake by using a couple of the other sills that we hadn’t used yet and did a fantastic job.

Although once he had installed the sill, we quickly realsied that the plasterer hadn’t quite been able to plater right up to the edge, so there were some more gaps that we had to fill in.

Now the room was starting to feel like it was nearly there. One last thing (or so we thought), and that was the flooring. Originally we were going to carpet the front room, and have some hard flooring in the dining room, but we wanted to keep the costs down and get things done as soon as we could. We popped over to our local carpet shop (literally around the corner) several times, as we kept trying to get some samples, and eventually got some to try.

We were sensible compared to last time and when for a reasonably priced option that would be quite hard waring.

One problem though; the manufacturers didn’t have any in stock so we had to wait a few extra weeks. As it turns out that would be a good thing.

The last job to do, was the skirting.  I was not looking forward to it, but I watched some YouTube videos to see how people did it, and we bought a proper mitre saw (having realised it was cheaper to buy one than rent one for a few days). However, things didn’t go as easily as planned. Despite following the instructions and having faith in trigonometry, the wood didn’t slide together as easily as I had hoped. And thanks to the plasterer, every wall had to have chunks of plaster taken off and sanded down so that the walls were even and straight (or as straight as we could make them).

Even after all of this, the skirting was pretty uneven and a bit of a mess. We hoped that after a bit of sanding and filling, it might be a bit better, but even this was a struggle. I don’t think I even took any photos of the skirting, as I was too stressed trying to get it done. And it took a hell of a lot longer than we’d expected too, so the delayed carpet turned out to be handy. In the last weekend before the carpet fitting, we even got Kate’s parents to come over and help finish of last few jobs, like caulk, sockets, and filling, to try and get everything finished.

After several attempts with the filler, a lot of sanding and several coats of paint, things started to look a bit more normal. All we had to do was remove the frog tape we placed around the skirting to protect the paint on the walls. How bad could that be?

As it turns out, this was not a simple job. And it meant that we had to go back over almost every inch of the wall that had been covered in the tape. And whilst this didn’t take long, we only had 2 days before the carpet was due to be fitted, so had to use all the spare time we had to get it done.
We’re not sure why this happened, or what we should have done to prevent it because we even bough specific ‘low-tack’ tape but it made absolutely no difference.

Thankfully we managed to get those bits covered just in time before the carpet fitters arrived.

The wood underneath was actually in not bad shape, and we could have used it. Maybe next time.

Random Holes

Standing by

The carpet fitting took hardly any time at all and for the first time in a long time, the room looked like it was ready to live in.