Phase I: Mould Begone (part ii)

The most enjoyable part of the works was the removal of the old mouldy utilty room.

Who knew there was a brick wall under that mouldy wall in the back? I have no idea what all of the differnet colours mean. And seeing the concrete roof/ceiling allowed us to better understand why the water kept seeping in. Surprise-surprise, half-arsed jobs and patches that never resolved the root cause were to blame. At least there were no huge surprises underneath it all!

Build it up, tear it down

One big change is the removal of the big frech sliding doors on the side of the utility room, and the creation of a door at the back. I’m sure it was fun having to drill a hole every few centimeters around where the new door needed to be. It created a very open plan look.

This new layout meant there was a lot more light, so the old toilet looked a lot less dingy, although all of these holes were soon boarded over, and temporary doors were put in.

But there wasn’t much time to enjoy that, because before we knew it, the walls were being torn down and the old toilet was no more, leaving some interesting pipework.

Stomzy

We also had a few storms to deal with. I think it was Storm Arwen that ripped off parts of the flat roof. Although this was the old roof and so had to come off anyway.

But slowly the walls went up, and some more of the weird and wonderful oddities were uncovered.

But things began to come together, with interal walls and insulation going up.

And very helpfully, a wonderful new (and importantly water-tight) roof was added, complete with yet more cat paw prints. Whilst it isn’t a sexy part of your house, or even a part that you think about very often, it is an amazing feeling to not have to worry about leaks and more mould every time it rains.

The Roof, the Roof, the Roof is on Fire

Wet, Wet, Wet

Plumbing was fun, with lots of new pipes being installed. And some rather horrible discoveries under the kitchen cupboards, of stuff that the pervious owner (or at least one of them) left behind.

But the progress didn’t stop. More walls, more insulation, even new doors, and a quick inspection from the cat, and we were on our way. Some of the old brick work was exposed now, and whilst it looked pretty cool, it caused problems, breaking the builders tools, and making the plastering difficult.

We even got as far as getting plaster on the walls (inside and out). Although this was a unexpected challenge, becasue depite now having a utility room that was water tight, getting rid of the moisture in the plaster proved tricky. After a few weeks, even with an industrial dehumidifier, there were still a few patches that wouldn’t go, but we had to press on.

Then we had to take a bit of a pause.

Whilst we had found the tiles that we liked, we managed to pick the specific ones that weren’t availble for 6 weeks. And then got delayed for even longer. So for a long time, we couldn’t do anything.

See part 3 for the final stage.

Bathroom on the cheap

I may have mentioned in a previous update that I planned on doing some improvements to the bathroom in order to be able to live with it for longer – as our extension will not be happening now for some time.

The old suite was all in grey paired with this awful orange-y wooden toilet seat and bath panel. In fact the original wooden toilet seat, when we moved it was so horrible we immediately threw it out. Paul replaced it on our first day in without letting me even looking at it, as he thought I might put off from going in the bathroom ever again! But even with that fixed, it was depressing to look at and with the grey floral tiles covering every wall, the room really just wasn’t cutting it. Oh, and did I mention the crusty grey carpet that was actually thinner that the vinyl we put down? With my medical condition, I actually spend more time than most in the bathroom so I have to look at it all quite a lot.

18236467_10212951405608661_1463466811_o

18236616_10212951407768715_945321467_o

These are the only pictures that I have of the old bathroom. They aren’t very good because, if I recall this was the day of moving in and I was busy trying to get pictures of it all and wasn’t really focusing much on quality at the time. I don’t think I would have ever expected to be publishing pictures of my toilet online (we can only go up in the world, I suppose).

Since the bath is a bit skanky and a bit small, we don’t really use it (except to wash all of the dirty paint brushes, rollers and trays). So the shower gets quite a lot of use, and unfortunately it was never sealed very well so it always left little wet patches on the nasty grey carpet. And if the shower got used a lot we even had a few water marks on the kitchen ceiling that’s underneath. Paul did try and fill in all of the gaps himself, and it helped a bit, but it didn’t really fix it. And we couldn’t do anything about the broken sides around the shower tray, so the first job we got done was fixing the shower, which I can confirm was much better than our own attempt. And now we’re safe in the knowledge that the flooring gets to dry out.

The next thing we did was to buy a replacement sink and toilet. We didn’t bother with the bath because it was expensive, and we don’t use it enough. The sink was one of the cheapest we could find and was in a clearance sale (bargain) and was actually quite nice. The toilet was probably the third cheapest option, so not too bad, but not a horrible flimsy one either. In total the sink and the toilet alone set us back about £125. The tap is a Grohe and cost about £50 including postage, I splashed out but it was worth the extra money. It makes the water all soft and bubbly and (best of all) it’s a mixer tap which means we can control the temperature and not have to scald ourselves with the hot tap.

However, before the new sink and toilet were installed, I spray painted the radiator. We could have replaced it and the new radiator would have cost around £20 but it wasn’t essential as it still works. I scrubbed it a bit with some steel wool and sprayed it all over. The radiator was a mixture of magnolia and white before I painted it, dotted with a few rust spots and flaking paint. The spray paint was from Amazon for £6. (If you look close, you can still see a few bumps and scrapes, but in general, it makes the bathroom look a lot better).

18261105_10212951427609211_187527605_o

We paid someone to install these, as although we’d be able to do it ourselves, we’d much rather a professional do it in case something goes wrong. (And also who wants to mess around with a dirty soil pipe when you don’t really know what you’re doing?)

We ordered some vinyl from Flooring Superstore, who can send out free samples.  The cost of the flooring was £40 but the shipping was £14.

I didn't choose any of these

I didn’t choose any of these

Before the vinyl was fitted, we decided to take a look at the floor boards because we could see a few dips and gaps under the carpet. And were glad that we did; there was two that were completely loose with a very large gap between them. Paul has decided that the previous occupants that did the renovations had a ‘that’ll fuckin do’ attitude, because one of the floorboards was actually a ‘tongue-and-groove’ board, whereas the rest weren’t. So obviously it didn’t fit properly and left gaps in the floor.

18289839_10212951388008221_1558010264_o

Paul took them out and we bought some wood from B&Q to replace them, and it was much better. Although a few of the boards were different thicknesses, so we had to plane them down and get rid of all of the spilt bits of plaster and, what appeared to be, old trodden in gum.

Bath before spraying

Bath before spraying

I decided at the last minute to spray the side of the bath white, in order for it match the rest of the room – as we didn’t replace it as we were trying to cut down on costs. I’m going to be honest here and fess up to doing a bit of a rubbish job. I didn’t bother to properly sand the side of the bath down, nor did I apply any primer. I just found some kitchen cabinet spray paint in B&Q and I wiped down the panelling after a very brief sanding and went for it. I used all of one can and by this point the colour was just starting to even out (downside to being lazy and not using primer) so I bought another. I paid £25 for the two cans.  If I’d used primer I wouldn’t have needed a whole can of the paint but then I would’ve had to buy primer as well and it was probably around the same price, so no regrets.

The bathroom is by no means perfect, we still have a crappy bath. There are still tiles that I hate, but the rest is fine.  And the vinyl is actually warmer and softer than the carpet that was removed, which proves just how awful the carpets are in this house. It also feels cleaner, although the new painted bath and nice clean vinyl shows just how faded some of the skirting is, so we need to give that a bit of a spruce and finish the last few bits.